My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-06_INSPECTION - C1981038 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981038
>
2016-01-06_INSPECTION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:09 PM
Creation date
1/7/2016 2:11:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Inspection
Doc Date
1/6/2016
Doc Name
Inspection Report
From
DRMS
To
Basil Bear
Inspection Date
1/4/2016
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 4, 2016 C-1981-038/Bowie No. 1 Mine JDM <br />HYDROLOGIC BALANCE -Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />All ditches and culverts at the East Mine designed to convey run-off from the reclaimed slopes to the ponds were <br />snow covered with no problems noted. The rock lined channel on the west side of the refuse disposal area was <br />snow covered and stable. <br />Ponds 1, 2, 3, and 4 and Ponds W-1, W-2, the Timber Storage Pond, and the West Ridge Pond were snow covered <br />and stable with no problems noted. No discharge was observed. <br />ROADS — Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />The East Mine Haul Road has been narrowed to the current configuration. All surface drainage is directed to the <br />roadside ditch on the uphill side of the road by water bars. The haul road was covered with a heavy amount of <br />snow, no problems were noted and no evidence of recent use was noted. <br />All roads associated with the East Mine were snow covered, stable, and inaccessible during the inspection with no <br />problems noted. <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.