Laserfiche WebLink
EXHIBIT G <br />WATER INFORMATION <br /> <br />The activities associated with Amendment 11 are not expected to affect surface or <br />groundwater systems over and above what was submitted as part of MLE2/Amendment <br />10. Exhibit G, through reference to the Sections of the Project Description itemized <br />below, contains a description of the ground and surface water conditions for the Cresson <br />Project. This Exhibit contains Drawing G-1, which shows surface water drainages and <br />ground water wells permitted through the Division of Water Resources/Office of the <br />State Engineer for a two-mile radius from the permit boundary. Appendix 2 in Volume II <br />also contains a compilation of groundwater and surface water data for the Cresson Project <br />and vicinity. Project water agreements are included as Appendix 9 in Volume IV of the <br />Amendment 11 documentation. <br /> <br />Drawing G-2 shows water rights for springs and surface water registered with the <br />Division of Water Resources/Office of the State Engineer within a two-mile radius. The <br />accompanying Project Description and appendices discuss the location of surface water <br />within the project area or on adjacent land as well as drainage and sediment control <br />measures used to manage runoff to protect surface and ground water resources. This <br />Exhibit and the accompanying discussions outlined below also identify any known <br />aquifers, and discuss the ground water system and the potential effects of the mining <br />operations on the ground water system. In addition, a discussion of project water <br />requirements and water supply is included in the Project Description. For a listing of <br />other permits existing at the site, including the existing permits with the Water Quality <br />Control Division, please see Exhibit M. <br /> <br />Information on surface and groundwater as well as project controls to eliminate potential <br />impacts is included in various parts of the Project Description in Volume I of this <br />application as outlined below. <br /> <br /> Section 4.6 Hydrology <br /> <br />Section 5.0 Mining and Operations Management Plan <br /> <br />Section 6.0 High Grade Mill Facilities <br /> <br />Section 7.0 Valley Leach Facilities <br /> <br /> Section 8.0 Precious Metals Recovery Facility <br /> <br /> Section 10.0 Surface Water Management <br /> <br /> Section 11.0 Monitoring <br /> <br /> <br /> <br />G-1