Laserfiche WebLink
EXHIBIT D <br />MINING PLAN <br /> <br />This Exhibit, through reference to the sections itemized below, describes the methods that <br />will be used for mining ore and overburden materials and associated beneficiation of the <br />ore for this Amendment 11. Surface mining methods at the Cresson Project will remain <br />essentially the same as currently approved. Amendment 11 adds underground <br />development and mining methods, extends the final crest elevation of the East Cresson <br />Overburden Storage Area (“ECOSA”), modifies the mining and backfilling sequence of <br />the Globe Hill/Schist Island Mining areas, and modifies the final stacking plan for the <br />Arequa Gulch Valley Leach Facility (“VLF”). The sections referenced below provide a <br />description of method(s) of mining to be employed; discussion of earthmoving; water <br />diversions and impoundments; the size of area(s) to be worked; and an approximate <br />timetable for the operations. Also referenced below are the sections that describe the <br />nature, depth, and thickness of the ore bodies to be mined; the primary and secondary <br />commodities to be mined; and the intended use. Gold and silver continue to be the <br />primary commodities mined at the site. The sections of the Project Description that <br />describe the mining and processing for both surface and underground operations also are <br />referenced below. <br /> <br />The information to address this Exhibit is contained in the Project Description in Sections <br />5.0, 6.0, 7.0, 8.0, 9.0, 10.0, 11.0, and 12.0 of Volume I of this application. The contents <br />of each section are described below. <br /> <br />Section 5.0 Mining and Operations Management Plan (Surface and <br />Underground) <br /> <br />Section 6.0 High Grade Mill Facilities <br /> <br />Section 7.0 Valley Leach Facilities <br /> <br />Section 8.0 Precious Metals Recovery Facility <br /> <br />Section 9.0 Support Facilities <br /> <br />Section 10.0 Surface Water Management <br /> <br /> Section 11.0 Monitoring <br /> <br /> Section 12.0 Reclamation and Closure <br /> <br />Appendices 1 through 14 contain detailed information relevant to the Mining Plan. These <br />appendices are summarized and referenced throughout the Project Description. <br /> <br />D-1