Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 11 <br /> 11 <br /> <br />Rule Number Brief Description of Rule Requirement Location in Application <br />6.4.21(17)(a-b) Soil survey map Appendix 3, Volume III <br />6.4.21(17)(c) Soil table Appendix 3, Volume III <br />6.4.21(18) Wildlife mitigation and protection <br />Sec. 14.18, Project Description <br />Volume I and Appendix 14, <br />Volume IV <br />6.4.21(19) Disposal of tailings and sludges Sec. 14.19, Project Description, <br />Volume I <br />6.5.1-4 Geotechnical evaluation Appendix 5, Volume III, <br />7.1 Compliance for designated mining <br />operations <br />Sec. 14, Project Description, <br />Volume I <br />7.2 Determination of designated mining <br />operations <br />Sec. 14, Project Description, <br />Volume I <br />7.3 Construction and certification NA / See MLE2 documentation <br />8 Emergency Response Plan Appendix 12, Volume IV <br />