Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 11 <br /> 4 <br /> <br />Rule Number Brief Description of Rule Requirement Location in Application <br />3.1.7(9) Reporting of groundwater discharges Sec. 11, Project Description, <br />Volume I <br />3.1.8(1) Wildlife protection <br />Sec. 12, 14, Project Description, <br />Volume I, Appendix 14, <br />Volume IV <br />3.1.8(2) Habitat management and creation <br />Sec. 12 Project Description, <br />Volume I, Appendix 14, <br />Volume IV <br />3.1.9(1) Topsoil segregation Sec. 5.3, Project Description, <br />Volume I <br />3.1.9(2) Woody vegetation Sec. 5.3, Project Description, <br />Volume I <br />3.1.9(3) Topsoil Storage Areas Sec. 5.3, Project Description, <br />Volume I, Exhibit C, Volume I <br />3.1.9(4) Stockpile management Sec. 5.3, Project Description, <br />Volume I <br />3.1.9(5) Stabilization of topsoil Sec. 5.3, Project Description, <br />Volume I <br />3.1.9(6) Other materials Sec. 5, Project Description, <br />Volume I <br />3.1.9(7) Replacement of growing media Sec. 12, Project Description, <br />Volume I <br />3.1.9(8) Vegetative piles Sec. 12, Project Description, <br />Volume I <br />3.1.10(1) Self-regenerating cover Sec. 12, Project Description, <br />Volume I <br />3.1.10(2) Forest Planting Sec. 12, Project Description, <br />Volume I <br />3.1.10(3) Range standard Sec. 12, Project Description, <br />Volume I <br />3.1.10(4) Successful revegetation Sec. 12, Project Description, <br />Volume I <br />3.1.10(5) Establishment of vegetation Sec. 12, Project Description, <br />Volume I <br />3.1.10(6) Weed control Sec. 4.9, Project Description, <br />Volume I