Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />prior to temporary cessation and an identification of back filling, regrading, revegetation, environmental <br />monitoring, and water treatment activities that will continue during temporary cessation. <br />4.30.2 Permanent <br />At the permanent conclusion of surface mining operations, Colowyo will close, backfill, or otherwise <br />permanently reclaim all affected areas. The reclamation plans are set forth in Section 2.05.5. The <br />projected post -mining topography is set forth on the Post -mining Topography map (maps 19C). <br />Colowyo will remove any equipment, structures, or other facilities at the conclusion of mining activities <br />and will reclaim the affected land. <br />END OF PERMIT REVISION APPLICATION PR -03 <br />Collom — Rule 4, Page 53 Revision Date: 9/28/11 <br />Revision No.: PR -03 <br />