Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />11. A-8 - Located in the West Fork of Good Spring Creek alluvium, this site represents the condition <br />up -gradient of South Taylor mining activities. <br />For the alluvial groundwater wells, water levels and field water -quality parameters (Temperature, <br />Water Level, pH and Conductivity) will be measured quarterly, samples for laboratory analysis <br />will be collected annually during the second quarter utilizing the paramaters listed below. <br />Annual Groundwater Laboratory Parameters <br />pH <br />Conductivity at 25°C <br />Total Dissolved Bicarbonate (HCO3 -)D <br />Solids <br />Calcium (Ca 1-2)D <br />Magnesium (Mg+z)D <br />Ammonia (NH3) <br />Nitrate Phosphate (PO4 as P) <br />Sodium (Na+) <br />Sulfate (SO4) <br />Arsenic (As) <br />Iron (Fe)D Lead (Pb)u <br />Manganese (Mn) <br />Mercury (Hg) <br />Selenium (Se)-ra <br />Zinc (Zn) 117 <br />D = Dissolved <br />TD = Total Dissolved <br />T = Total <br />TR = Total Recoverable <br />Prior to mining at Lower Wilson, the following three alluvial groundwater monitoring sites will <br />be added to the sampling schedule: <br />1. MW -95-01 — Located in the Wilson Creek alluvium, this site represents the upstream, <br />undisturbed background conditions of the alluvial aquifer. <br />2. MW -05-03 — Located in the Wilson Creek and unnamed drainage alluvium, this site <br />represents alluvial groundwater quality immediately downgradient from Lower <br />Wilson. <br />3. MW -95-02 — Located in the Wilson Creek alluvium, this site represents the <br />downgradient conditions below Lower Wilson and the proposed haul road. <br />Groundwater, Fill Piezometers - The West Pit Fill piezometer will be monitored quarterly for <br />water levels. After mining, two additional piezometers will be installed into the toes of East <br />Taylor Fill and West Taylor Fill as described in Exhibit 21 Item 1. These piezometers will be <br />added to the monitoring program. <br />A future spoil water monitoring well will be drilled (and water quality monitored) as identified on <br />Map 41 B in the reclaimed Collom Lite Pit area to monitor and measure the potential development <br />of a spoil aquifer. This location represents the lowest point in the proposed Collom Lite Pit. <br />Colowyo has also agreed to monitor well C-04-16 to collect information on potential impacts to <br />bedrock groundwater quantity and quality prior to, during and post mining activities in the <br />Collom Expansion Area. The monitoring frequency and parameters captured will mirror those <br />established for the monitoring of alluvial groundwater wells. <br />Points of Compliance - <br />PO/NTS OF COMPLIANCE - WATER MONITORING, RIO TINTO COLOWYO MINE <br />MEEKER, COLORADO <br />Prepared by Brant A. Dennis, C.P. G. <br />March 2009 <br />Collcm — Rule 4; Page 16 Revision Date: 9/28/11 <br />Revision leo.: PR -03 <br />