My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-06_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2015-10-06_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2017 9:56:15 AM
Creation date
1/6/2016 9:31:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/6/2015
Doc Name
Collom Access Road Culverts
Section_Exhibit Name
Volume 20 Exhibit 24 Item 1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 3 - Trihydro Flood Calculation for the Jubb Creek Culvert <br />TRIHYDRO-98 <br />25 Year Design Storm, Jubb Creek Road Crossing <br />SCS Type H, 24 -Hour General Storm <br />25 -Year Return Period <br />Drainage Basin Characteristics <br />Drainage Area (A) <br />7.290 square miles <br />Stream Length of Longest Watercourse (L) <br />6.510 miles <br />Elevation Difference Along Longest Watercourse (H)__ <br />1,650.000 feet <br />Runoff Curve Number (CN) <br />63.000 <br />Minimum Infiltration Loss (iph) <br />0.000 inches/hour <br />Precipitation for the Specified Storm <br />Adjusted Precipitation for the Selected Storm <br />2.300 inches <br />Resultant Horograph values <br />Peak Discharge <br />131.01 cis <br />Runoff Volume <br />70.36 acre-feet <br />Time to Peak Discharge <br />14.27 hours <br />Time of Concentration <br />2.19 hours <br />Each. 24-1-5 Revision Date: 09/21/15 <br />Revision No.: TR -106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.