Laserfiche WebLink
Jubb Creek Crossings <br />For the Jubb Creek Culvert, the upstream drainage area consists of the combined streamflows <br />from both the West Fork and East Fork of Jubb Creek. Map 12B shows the boundaries of this <br />drainage basin. At the proposed crossing point, the upstream drainage area is about 4,665 acres <br />(7.29 square miles). <br />Rule 4.03.1(4)(e) requires that crossings be designed for a 10 year -24 hour event if the average <br />end area of the culvert is expected to less than 35 square feet (an 80 -inch diameter culvert). <br />Nevertheless, for a more conservative approach, the culvert at Jubb Creek has been designed for <br />the 25 year -24 hour event. Trihydro predicts the peak flow from the 25 Year storm to be 131 cfs <br />and the total runoff volume to be 70 acre-feet (see Figure 3). <br />Figure 4 presents a generally accepted FHWA nomograph for flow through culverts operating <br />under the entrance control condition. The nomograph is marked up to illustrate acceptable pipe <br />diameters for the Jubb Creek crossing. Acceptable solutions have been limited to diameters that <br />can deliver the design flow with a Headwater/Diameter (HW/D) ratio of 1.5 or less. Pipe ends <br />mitered to conform to the slope have been assumed, and the pipe will have riprap placed at the <br />sides and inlet to a height 4 feet about the top of the crown. <br />At Jubb Creek, Figure 4 indicates that a single 5 -foot diameter culvert can pass the 131 cfs <br />design flow with a HW/D ratio of 1.3. <br />General Culvert Design <br />For all of the remaining smaller culverts, Culverts A through T, SEDCAD was used to determine <br />the design flow. Tables 1 and 2 provide a listing of the relative percentage of various vegetative <br />communities and associated drainage areas for each culvert. These vegetative communities are <br />shown on Sheet 2 of Map 25E. As noted in Table 2, most of the culverts also have some <br />contribution from direct runoff from the road surface as well. <br />Two representative SEDCAD analyses are attached. These are both based on a 10 year, 24 hour <br />design event. By inspection, it can been seen that the largest runoff volumes from these twenty <br />small watersheds would be expected to occur at culverts D and N, as these have the largest <br />drainage area and somewhat higher curve numbers. As shown of the attached SEDCAD <br />analyses, the D culvert installation shows that a 10 inch culvert is suggested, while the N <br />installation recommends a 24 inch culvert. All other culvert installations would be expected to <br />predict similar or smaller culvert installations. As a conservative design element, all culverts A <br />through T will be 36 inches in diameter. This size will ensure better results should future <br />cleaning or maintenance be required. <br />Culvert installation lengths will vary as shown on the plans but typically range from 165 feet to <br />335 feet. All culverts shall have riprap erosion protection at the outlet points. All culverts shall <br />be installed at a minimum barrel slope of 1.5 percent. <br />Exh. 24-1-2 Revision Date: 09/21/15 <br />Revision No.: TR -106 <br />