My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-23_PERMIT FILE - C1982056 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2015-12-23_PERMIT FILE - C1982056 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:45 PM
Creation date
1/6/2016 9:09:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
12/23/2015
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
future use in reclaiming the site. A temporary soil stockpile(s) will be established on the east end of the pad area <br />adjacent to the road, where natural drainage will route around the stockpile(s) due to the existing natural drainage <br />configuration, and the natural vegetative materials incorporated into the soil, and seeding with the topsoil stockpile <br />stabilization seed mixture, will stabilize and protect the stockpiled soil materials.. Soil salvage volumes are <br />indicated on Table 49A. <br />5MN Borehole and Pipelines (MR14-283. MR15-288) — Construction of the light -use road and pad for the 5MN <br />Cement Borehole will involve removal of any large vegetation and stripping and stockpiling of other vegetation, <br />soil, and organic materials. The road and pad are located along the crest of a minor ridgeline where soil <br />development is limited, so TC will recover and salvage a maximum of 12 inches of soil from the road and pad <br />areas. With a pad area of approximately 0.9 acres, and a road corridor of approximately 3.1 acres, a maximum <br />volume of approximately 6,540 cubic yards of soil material will be salvaged and placed in stockpile for future use <br />in reclaiming the site. A temporary soil stockpile(s) will be established on the northeast corner of the pad area <br />adjacent to the road. The natural vegetative materials incorporated into the soil, and seeding with the topsoil <br />stockpile stabilization seed mixture, will stabilize and protect the stockpiled soil materials. Soil salvage volumes <br />are indicated on Table 49A. Pipeline construction will involve temporary removal and windrowing of soilmaterials <br />from the pipeline trench area (maximum pipeline corridor width of 40 feet). The maximum disturbance footprint <br />will be approximately 4.6 acres, corresponding to a maximum soil salvage volume of approximately 7,400 cubic <br />yards (at a 12 -inch salvage depth). Since, however, the soil will be progressively removed, windrowed, and then <br />almost immediately replaced, as pipeline construction proceeds, this soil salvage volume is not reflected in Table <br />49A — Soil Stockpile Summary. <br />10 -East Emergency Air Borehole (MR15-289) — Prior to construction of the l0E Emergency Borehole pad, site <br />preparation will involve removal of any large vegetation and stripping and stockpiling of other vegetation, soil, and <br />organic materials. The pad is located on a minor ridgeline where soil development is limited, so TC will recover <br />and salvage a maximum of 12 inches of soil from the pad disturbance areas. With a total pad area of approximately <br />1.2 acres, a maximum volume of approximately 1,900 cubic yards of soil material will be salvaged and placed in <br />stockpile for future use in reclaiming the site. One or more temporary soil stockpile(s) will be established on the <br />north side of the pad area. The natural vegetative materials incorporated into the soil, and seeding with the topsoil <br />stockpile stabilization seed mixture, will stabilize and protect the stockpiled soil materials. Soil salvage volumes <br />are indicated on Table 49A. <br />13 -Left Outby Utility Borehole (MR15-291) — Construction of the light -use road and pad for the 13LT Outby <br />Utility Borehole will involve removal of any large vegetation and stripping and stockpiling of other vegetation, soil, <br />and organic materials. The road and pad are located on a low -gradient sidehill where TC will recover and salvage a <br />maximum of 18 inches of soil from the road and pad areas. With a pad area of approximately 1.0 acres, and a road <br />corridor of approximately 2.4 acres, a maximum volume of approximately 8,230 cubic yards of soil material will be <br />salvaged and placed in stockpile for future use in reclaiming the site. A temporary soil stockpile(s) will be <br />established on the northwest side of the pad area. The natural vegetative materials incorporated into the soil, and <br />seeding with the topsoil stockpile stabilization seed mixture, will stabilize and protect the stockpiled soil materials. <br />Soil salvage volumes are indicated on Table 49A. <br />MR 15-291 2.05-84.13 12/22/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.