performance standards of 4.06.2. This narrative shall specify the depth of material to be salvaged from all disturbed
<br />areas based on the soil information required by 2.04.9 and shall specify the volume of each type of material to be
<br />salvaged. A map of any proposed storage structures shall accompany the narrative. The maps shall be prepared
<br />accordine to the reauirements of 2.10.
<br />I1"-&3O��
<br />See response to 2.05.4, Reclamation Plan, below for details concerning the Foidel Creek Mine. TC does not propose to
<br />disturb any additional land within the Fish Creek Tipple permit area. The Fish Creek Tipple and adjoining haulroad
<br />were constructed prior to the promulgation of regulations mandating topsoil salvage and storage. Thus, the best
<br />plant growth medium available is a mixture of spoil and soil materials which will be substituted for topsoil. This
<br />situation is further discussed within the Fish Creek Tipple/Loadout Appendix, pages 2.04-36 through 2.04-38 and
<br />pages 2.05-37 through 2.05-38 of Volume VIII.
<br />Eastern Mining District Dewatering Facility - The Eastern Mining District Dewatering Facility will require
<br />salvaging and stockpiling approximately 13,360 CY of topsoil from the access road and the facility site. During
<br />upgrading of the road, approximately 3,600 CY of topsoil will be windrowed to the side of the road. The topsoil
<br />along the length of the road is approximately 30 inches deep. The facility site will require salvaging and
<br />stockpiling approximately 8,300 CY of topsoil. The topsoil from the site area is approximately 30 inches deep. A
<br />test pit will be dug to verify the topsoil depth obtained from previous soil mapping work. The stockpiled topsoil,
<br />which is located within the pad area, will be stabilized with the topsoil stockpile stabilizing seed mixture.
<br />Additionally, approximately 6,295 CY of topsoil will be salvaged from the treatment pond site. This site has been
<br />relocated closer to the road to facilitate delivery of chemicals.
<br />Bleeder Fan - The bleeder fan facility will require salvaging and stockpiling approximately 4,700 CY of topsoil
<br />from the access road and the facility site. During the upgrading of the road, approximately 2,800 CY of topsoil will
<br />be windrowed to the side of the road and left in place. The 1,200 CY that will be salvaged from the road extension
<br />will be placed in the stockpile that will be established on the fan pad. In addition to the topsoil stockpiled from the
<br />road extension, approximately 740 CY will be salvaged and stockpiled from the pad. The soil resources
<br />information was derived from information presented in Exhibits 7 and 8, Soil Profile Description and Soil Mapping
<br />Unit Descriptions, Map No. 19, Mine No. 3, Soils presented in permit C-84-062. These materials are incorporated
<br />herein by reference. At the bleeder fan site, TC will establish a test pit to verify topsoil depths prior to salvaging
<br />topsoil. The stockpiled topsoil, which is located within the pad area, will be stabilized with the topsoil stockpile
<br />stabilizing seed mixture. Prior to salvaging any topsoil from the site, a T & E species reconnaissance for Ute
<br />Lady's Tresses, Spiranthes diuvialis, will be conducted, and the results forwarded to the Division. It is not
<br />anticipated that this species will be found, as the site appears to be outside of its natural range.
<br />18 Right Ventilation Shaft (TR04-44
<br />Approximately 4,400 feet of the access road crosses upland areas, with the remaining 2,700 feet crossing lowland
<br />areas where road construction will involve removal of any large vegetation and stripping and stockpiling of other
<br />vegetation, topsoil, and organic materials. Similarly, the shaft pad is located in an upland area. Given an average
<br />topsoil depth of approximately 6 inches in the upland area and a total road disturbance area of approximately 5.7
<br />acres, approximately 4,600 cubic yards of topsoil will be salvaged from the road corridor, and 2,000 cubic yards
<br />from the 2.5 acre pad area. Prior to initiating soil removal, the stream buffer zone will be marked with identifying
<br />signs to prevent surface disturbance within buffer zone areas. The topsoil from the road corridor was initially
<br />windrowed adjacent to the road and topsoil from the pad area was placed in a stockpile adjacent to the shaft pad and
<br />within the road corridor, for future reclamation use. As a result of concerns related to protection of windrowed
<br />topsoil from erosion and contamination, a decision was made to recover topsoil from the windrows and place it in
<br />stockpile. The topsoil salvage volumes are indicated on Table 49A. Seeding with the topsoil stockpile stabilization
<br />seed mixture identified on page 2.05-121 will stabilize the windrowed and stockpiled topsoil.
<br />6 -North Mains Ventilation Shaft (TR05-48)
<br />Along the 2,930 -foot access road, construction will involve removal of any large vegetation and stripping and
<br />stockpiling of other vegetation, topsoil, and organic materials. Similarly, the shaft pad is located in an upland area.
<br />MR 15-291 2.05-84.11 11/11/15