Laserfiche WebLink
a nominal diameter of 4.5 inches. A collar for pumping the concrete will be fitted to the cased wellhead. Concrete <br />will be delivered by mix trucks, dropped down the borehole, and transferred underground to the construction area <br />using a pipeline or underground equipment. <br />The ULT Outby Utility Borehole installation will remain in-place until the planned construction activities are <br />completed, and will then be reclaimed. Reclamation of this installation will involve plugging and sealing the <br />borehole, regrading the pad and road to their approximate original configuration, soil material replacement, and <br />reseeding with TC's standard Rangeland Seed Mix. <br />MR 15-291 2.05 — 45.30 11/17115 <br />