Laserfiche WebLink
9. During the temporary pipe time frame, the Reeder/Garret/Johnson distribution box will <br />be supplied from an 8" diameter SDR 26 pipe leading from the main pipe. <br />2. Timing <br />Temporary pipe will be laid during sometime in 2001 and will be put into operation either during <br />for the latter part of the irrigation season of 2001 or will be ready for the 2002 season. This will <br />depend on mining advance. <br />After mining continues west of 2700 Road and the area for the permanent line has been <br />backfilled and graded, the permanent line can be installed and should be ready for the 2005 <br />irrigation season. <br />T. Relocation of Utilities <br />1. Electric <br />When the mining operation crosses BB Road, the buried phone line and overhead power line <br />along it will be relocated to the BB Detour Road. The buried phone line and overhead power line <br />along 2700 Road will be temporarily located along the Morgan access road located south of the <br />property. Once 2700 Road is restored, the utilities will be restored in this permanent ROW as <br />well. The phone lines are under the control of Nucla - Naturita Telephone Company and the <br />power line is owned and operated by San Miguel Power Association. The locations of the <br />original utilities, as well as the relocated utilities, are shown on Map 2.05.3(3)-3. The following <br />table summarizes the distances of power and phone lines that were removed and relocated. <br />As of January 2010, the mining operations have advanced west of 27 Rd. New overhead electric <br />lines were installed and put into service in 2009, alongside the newly constructed 27 Rd in the <br />permit boundary and leading to Second Park homes. As well, the temporary buried power lines <br />paralleling BB Detour was abandon that formally serviced Second Park residence. The buried <br />power line that paralleled BB 27 Rd, from Patty Morgan's home to Frank Morgan's house is still <br />in use and San Miguel Powers plan is to leave it as the permanent installation. As of now, the <br />buried power line continues around the edge of BB 27 Rd to the Enstrom families. When <br />mining is finished on the WFC/Johnson property, a new overhead electric line will be <br />constructed along the newly constructed BB West Rd, starting at 1313/27 Rd intersection and <br />going west to service the Enstrom families. When this is complete, the temporary buried power <br />line from Frank Morgan's home to BB West Rd will be abandon. The old overhead line that <br />Page 2.05.3(3)-49 October 2015 (TR -69) <br />