My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-11_PERMIT FILE - C1981008 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-12-11_PERMIT FILE - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:18 PM
Creation date
1/5/2016 1:17:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2015
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Table of Contents & Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
which is approximately in the same ROW as the original ditch. The CCC is happy with the <br />work and as of early 2010, a signed easement for the pipelines from each land owner needs to be <br />filed. WFC is working on this detail. All users seemed to be happy with the permanent installed <br />pipeline. <br />A 12" HDPE pipeline, with three takeout's, will be installed along BB Road west of 2700 Road <br />to provide irrigation water for the Lloyd, Benson, Morgan, and WFC properties on that side of <br />the mine. <br />The location of the pipeline structure on Map 2.05.4-5 is the permanent location. The design <br />details and historical information regarding the ditch relocation can be seen below. <br />S. Historical Information Regarding CCC Ditch Relocation <br />The following information is from the original CCC ditch relocation sub -section of the New <br />Horizon Permit. As of the Mid Term Review of 2006, the HDPE pipeline was installed as <br />described below and has operated with no significant problems. All ditch users are satisfied with <br />the performance of the pipeline. It is important to note that the CC Company has accepted the <br />pipeline as a permanent structure. The location of the pipeline structure on Map 2.05.4-5 is the <br />permanent location. <br />The Colorado Cooperative Company as operated an irrigation ditch known as the West Lateral <br />Ditch to irrigate lands in the area for many decades. With the mines advance to the north though <br />BB Road; this ditch needs to be diverted. Since the temporary detour route involves rises and <br />dips, a pipeline must be used. The plans enclosed in this document show the detailed design of <br />the pipeline temporary route and the permanent relocation. <br />After evaluation of all alternatives, it is believed that a high density polyethylene (HDPE) <br />pipeline is the best choice for the temporary and permanent routes. Although expensive, we feel <br />that this design will best suit the long term needs of the CC Co. <br />The portion of ditch to be replaced begins near the eastern portion of the Martin property and <br />ends at the ditch crossing of 2700 Road. This distance is approximately 4616 feet with an <br />elevation drop of 77 feet. This is an average grade of 1.67%. The ditch will be disrupted in early <br />2002; therefore the temporary route will need to be installed prior to this time. Installation would <br />be undertaken well in advance of the irrigation season to ensure that the system is fully <br />functional when it is needed. <br />Page 2.05.3(3)-47 October 2015 (TR -69) <br />
The URL can be used to link to this page
Your browser does not support the video tag.