Laserfiche WebLink
which is approximately in the same ROW as the original ditch. The CCC is happy with the <br />work and as of early 2010, a signed easement for the pipelines from each land owner needs to be <br />filed. WFC is working on this detail. All users seemed to be happy with the permanent installed <br />pipeline. <br />A 12" HDPE pipeline, with three takeout's, will be installed along BB Road west of 2700 Road <br />to provide irrigation water for the Lloyd, Benson, Morgan, and WFC properties on that side of <br />the mine. <br />The location of the pipeline structure on Map 2.05.4-5 is the permanent location. The design <br />details and historical information regarding the ditch relocation can be seen below. <br />S. Historical Information Regarding CCC Ditch Relocation <br />The following information is from the original CCC ditch relocation sub -section of the New <br />Horizon Permit. As of the Mid Term Review of 2006, the HDPE pipeline was installed as <br />described below and has operated with no significant problems. All ditch users are satisfied with <br />the performance of the pipeline. It is important to note that the CC Company has accepted the <br />pipeline as a permanent structure. The location of the pipeline structure on Map 2.05.4-5 is the <br />permanent location. <br />The Colorado Cooperative Company as operated an irrigation ditch known as the West Lateral <br />Ditch to irrigate lands in the area for many decades. With the mines advance to the north though <br />BB Road; this ditch needs to be diverted. Since the temporary detour route involves rises and <br />dips, a pipeline must be used. The plans enclosed in this document show the detailed design of <br />the pipeline temporary route and the permanent relocation. <br />After evaluation of all alternatives, it is believed that a high density polyethylene (HDPE) <br />pipeline is the best choice for the temporary and permanent routes. Although expensive, we feel <br />that this design will best suit the long term needs of the CC Co. <br />The portion of ditch to be replaced begins near the eastern portion of the Martin property and <br />ends at the ditch crossing of 2700 Road. This distance is approximately 4616 feet with an <br />elevation drop of 77 feet. This is an average grade of 1.67%. The ditch will be disrupted in early <br />2002; therefore the temporary route will need to be installed prior to this time. Installation would <br />be undertaken well in advance of the irrigation season to ensure that the system is fully <br />functional when it is needed. <br />Page 2.05.3(3)-47 October 2015 (TR -69) <br />