My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-11_PERMIT FILE - C1981008 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-12-11_PERMIT FILE - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:18 PM
Creation date
1/5/2016 1:17:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2015
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Table of Contents & Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Location <br />WFC will locate light -use roads on ridges or on a stable slope in order to minimize erosion. No <br />part of any light use road will be located in the channel of an ephemeral stream where the <br />upstream watershed is larger than one square mile and in intermittent or perennial streams unless <br />specifically approved by the CDRMS. Stream fords of an ephemeral stream when the upstream <br />watershed is larger than one square mile and intermittent or perennial stream will be approved by <br />the CDRMS before construction proceeds. All other stream crossings will consist of culverts in <br />flowing streams, consistently wet areas, and in ephemeral channels as necessary to allow passage <br />and to minimize disturbance of the hydrologic balance. Light -use roads will utilize culverts <br />designed to safely pass the 10 -year, 24-hour precipitation event. Ditches and drainage control <br />will be established during construction and maintenance of the roads to minimize erosion and to <br />assist traffic passage. <br />The 5th Street Light Use Road starts on the southeast corner of the permit area and proceeds <br />north along the overburden stockpile and enters the old 5th Street at Station 23+50. The road then <br />continues west to Station 53+80 which is west of Pond 007. <br />3. Design and Construction <br />Light -use roads will be field engineered to follow the existing topography as much as <br />practicable. Topsoil will be removed and stockpiled in accordance with WFC's topsoil salvage <br />plan. The horizontal and vertical alignment will be dictated by the topography and the need to <br />avoid obstructions. Light -use road surfacing material will be adequate for the use of the road. <br />Acid or toxic -forming substances will not be used in the road surfacing. Light -use roads will be <br />maintained to minimize erosion and to allow passage of traffic. <br />The plan and profile of the 5Th Street Road is shown on Map 2.05.3(3)-8 Mine Roads. As shown <br />on the map, the road is 5380 feet long and actually starts on the southeast corner of the permit <br />area, near Lincoln Avenue, south of 5th Street. As seen in the profile on the same map, the road <br />has a grade of between 0% and 4% grade and an average width of 30 feet. All temporary <br />drainage crossings are designed for the 10 year 24 hour event and all permanent drainage <br />crossings are designed for the 100 year 24 hour event, as shown on Map 2.05.3(3)-1 Surface <br />Hydrology and Attachment 2.05.3(3)-1-3 Collection/Diversion Culverts and Ditches. The map <br />shows the details of the drainage basins and the Attachment shows the designs of the culverts <br />and roadside ditches. <br />The same equipment and procedures for compaction that are described in the Demonstration for <br />the NE Perimeter Haul Road were also used for this road. The road has been in place since 1993 <br />without any problems of stability, erosion, puddling, crown problems, or any other issue that <br />Page 2.05.3(3)-33 October 2015 (TR -69) <br />
The URL can be used to link to this page
Your browser does not support the video tag.