My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-11_PERMIT FILE - C1981008 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2015-12-11_PERMIT FILE - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:18 PM
Creation date
1/5/2016 1:17:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2015
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Table of Contents & Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Sedimentation Ponds 008 through 018 Design Parameters <br />In accordance with Rule 4.05.2, WFC will use Ponds 007 through 018 to prevent, to the extent <br />possible, additional contributions of sediment to stream flow or runoff outside the permit area <br />due to mining disturbance. Ponds 010 and 011 have been fully reclaimed and the drainage area <br />that was previously to be handled by these ponds is now handled by Pond 013. The pond designs <br />and or run-off calculations for the sedimentation ponds are shown below: <br />Pond 007 Attachment 2.05.3(3)-2 As Built Map 2.05.3(3)-2-1 & -2-2 <br />Pond 008 Attachment 2.05.3(3)-4 Map 2.05.3(3)-4-1& -4-2 <br />Pond 009 Attachment 2.05.3(3)-5 Map 2.05.3(3) -5-1 <br />Pond 013 Attachment 2.05.3(3)-6 & 21 Map 2.05.3(3)-6-1 <br />Pond 011 Attachment 2.05.3(3)-20 Map 2.05.3(3)-14 <br />Pond 012 Attachment 2.05.3(3)-12 and 13 Maps 2.05.3(3)-12-1 through 4 <br />Pond 014 Attachment 2.05.3(3)-11 Map 2.05.3(3)-11 <br />Pond 015 Attachment 2.05.3(3)-22 & 24 Maps 2.05.3(3)-15 & 19 <br />Pond 018 Attachment 2.05.3(3)-28 Maps 1, 2, & 3 <br />Ponds 007 and 008 are the only ponds that will remain after reclamation. Pond 013 will remain <br />for some time after the reclamation of the surrounding land, but will not be permanent. The <br />demonstration to allow retention of Pond 007 is Attachment 2.05.3(3)-16. The demonstration to <br />allow retention of Pond 008 is Attachment 2.05.3(3)-19. <br />Map 2.05.3(3)-1 shows the locations of the as -built and yet -to -be built ponds. <br />Pond 014 was the post -mine conversion of the pre -mine SAE #2. It was reclaimed along with the <br />BB detour road and no longer exists as of April 2010. <br />The sedimentation ponds are designed, constructed, and maintained as follows: <br />a. Ponds 008, 009, 011, 012, and 013 have been designed to contain the 25 year 24 <br />hour event with no discharge from the emergency spillway. Pond 011 and Pond <br />013 will have an expected permanent discharge of 1.34 cfs due to pit pumping, <br />but all sediment pond rules are also satisfied, as shown in Attachment 2.05.3(3)- <br />14. Ponds 014, 015, and 018 have been designed for a 100 -year 24-hour event <br />with no discharge. Due to their small drainage area and completely incised <br />impoundment, there are no embankments to fail and so only run-off volume <br />calculations have been performed. <br />Page 2.05.3(3)-13 October 2015 (TR -69) <br />
The URL can be used to link to this page
Your browser does not support the video tag.