Laserfiche WebLink
PERMIT #: M-1977-081 <br />INSPECTOR’S INITIALS: PSH <br />INSPECTION DATE: December 10, 2015 <br /> <br /> <br />Page 2 of 10 <br />OBSERVATIONS <br /> <br />The Greeley West site was inspected by Peter Hays with the Division of Reclamation, Mining and Safety  <br />(Division/DRMS) in response to an acreage reduction request (AR‐02) filed by the Operator on October 26,  <br />2015.  The Division is required by Rule 4.17.2 to inspect the lands and reclamation described in the request to  <br />determine if the Permittee has complied with all applicable requirements.  Mr. Mike Hart with Hart  <br />Environmental representing Cottonwood Land and Farms, LLC (Cottonwood) and Mr. Bill Schenderlein with  <br />Blue Earth representing the City of Greeley (City) were present during the inspection.  The Greeley West site  <br />was inspected in conjunction with the 25th Ave Site, M‐2002‐020.  <br />  <br />The Division will deny the acreage reduction request (AR‐02) based on the observations from this  <br />inspection.  <br />  <br />In the release request letter, the Operator states the site is currently permitted for 203.13 acres.  The  <br />Operator requested a release of 164.4 acres from Greeley West site, leaving 38.49 permitted acres.  The  <br />remaining 38.49 acre site would include the Cottonwood owned parcel north of the Cache La Poudre River and  <br />the 0.24 acre access easement to O Street leased from Flatirons Sand and Gravel Company.  The 164.4 acres  <br />requested for release include; the 38.16 acre parcel owned by Cottonwood in the southeast corner of both  <br />sites, 2.31 acres for the railroad easement in the southwest corner of the site, 3.38 acres for the 35th Street  <br />easement along the west side of the site, and 1.18 acres for the Poudre Trail easements in the northeast  <br />corner of the site.  The Division assumes the remaining requested release acreage includes the south and east  <br />portions of the Greeley West site included into the 25th Ave Site under the 2012 amendment application.   <br />However, the remaining acreage reduction acreage, 119.37 acres, does not match the 2012 amendment  <br />acreage of 195.48 acres.  The Operator must clarify this difference in acreages in any future acreage reduction  <br />requests.  <br />  <br />The Division’s inspection focused on the northern and southeast parcels owned by Cottonwood.  <br />  <br />38.16 acre southeast corner parcel  <br />The southeast parcel included in the release request was observed during the inspection.  The parcel is  <br />defined by 25th Ave to the east, t‐posts and the tops of the pond berms to the north and fence line and F  <br />Street to the south.  The visual topsoil stockpiles located in the southeast corner of the parcel remain in place.   <br />The topsoil stockpiles will be used by Cottonwood to reclaim portions of the southeast parcel.  The slopes in  <br />portions of the east pond were steeper than the required 3H:1V.  The Operator stated the slopes would be  <br />regraded to less than 3H:1V.  Two erosion gullies were noted in the northeast corner of the east pond.   <br />Cottonwood stated the gullies will be repaired as part of the pond regrading.  The house and tennis court  <br />located in the original Greeley West site permit boundary north of O Street have been raised.  The area will  <br />need to be reclaimed as part of the final reclamation of the Greeley West site.  The Division records indicate  <br />the house area is included in the Greeley West permit boundary, but was not included in the 25th Ave Site.   <br />The south pond was observed at the request of Cottonwood.  The pond slopes were reclaimed to the required  <br />3H:1V slope, topsoiled and vegetated to the water line prior to the dewatering of the southwest ponds to  <br />allow dry mining the southwest ponds.  Cottonwood is concerned the groundwater elevation will be reduced  <br />once the slurry wall around the southwest pond is completed.  The south pond shorelines consisted of gravelly  <br />slopes with annual weeds below the former waterline.  The pond slopes will need to be topsoiled and  <br />revegetated with the approved seed mixture if the groundwater level does not return to the previous  <br />elevation.  The truck traffic disturbance in the west end of the parcel has been recently reclaimed by