Laserfiche WebLink
Steve Baker <br />January 4, 2016 <br />Page 5 <br />Page 5 of 6 <br />the substance to be mined, and the type of structure and uWnerz of reco'd of any <br />permanent or man-made structures within 200 feet of the affected area; <br />i he eAi-Ail IS M Imap needs surface owners laaeled as well. Include the owner of the fence7stack <br />yard. <br />(c) <br />outline and label all major surtace teatures to Be used in connection with the <br />proposed operation such as: existing and proposed roads, pit boundary, topsoil <br />stocRpiles, overburden stockpiles, product stocRpiles, waste rock fills, stream <br />channels, buildings, processing plant, underground openings such as adits or <br />ventilation tacilities, ponds, impoundments, dewatering pumps, diversions or <br />waste disposal areas; <br />Please show the creek path outside of permit boundary. <br />(d) <br />I <br />I indicate the direction that construction material extraction will proceed; <br />Please show where material was cut from and deposited within the permit boundary. <br />(3) <br />Reclamation Plan IGlap <br />(a) <br />snow tRe gradient of all reclaimed slopes (horizontal:vertical) sufficient to describe <br />tRe post mine topograpRy; <br />Include contours of phase 2. <br />(b) <br />indicate Where vegetation will not be estaBlisRed and the general area(s) for shrub <br />or tree planting; <br />No areas are mentioned therefore the entire permit Boundary will be seeded unless the Division is <br />otherwise notitied. Please make a note on the map to indicate the entire permit area will be seeded. <br />(c) <br />it ponds are a part of the Reclamation Plan, oatline the final shore configuration <br />of the ponds and shallow areas if the future land aye is for wildlife; <br />Identify the preliminary creek path and note that the final configuration will be pending COPR/EPA <br />permit approval. Upon approval maps will neea to be revised to show any changes. <br />(e) <br />state the average thickness of replaced topsoil 5y reclamation area or phase. <br />Please specify the range. <br />6.3.6 <br />EXHIBIT F - List of Other Permits and Licenses Required <br />Provide a statement identifying which of the following permits, licenses and <br />approvals which are Field orwill be sought ;n orderto conduct the proposed mining <br />and reclamation operations: effluent diachauge permits, air quality emissions <br />permits, radioactive source materials licenaea, disposal of dredge and fill material <br />(404) permits. permit to construct a dam. Well permits, explosives permits, State <br />Historic Preservation Office clearance, highway access permits, U.S. Forest Service <br />permits. Bureau of [and Management permits, county zoning and lana use <br />permits_ and city zoning and land uze permit. <br />Are there any county requirements? <br />Page 5 of 6 <br />