Laserfiche WebLink
PERMIT #: M-2002-020 <br />INSPECTOR’S INITIALS: PSH <br />INSPECTION DATE: December 10, 2015 <br /> <br /> <br />Page 3 of 10 <br />reclamation at the site, however the parcel can be released from the 25th Ave Site and remain in the Greeley  <br />West permit until the reclamation is complete in the parcel.  The Division will approve the release request for  <br />the southeast parcel from the 25th Ave Site since the parcel will remain in the Greeley West permit.  The  <br />required reclamation of the topsoil berms, the east pond slope grading, the erosion gullies and the former  <br />house and tennis courts will be performed under the Greeley West permit.  The Division will deny the release  <br />request of the southwest parcel from the Greeley West permit.  <br />  <br />The permit sign was posted at the entrance gate as required by Rule 3.1.12(1).  Photographs taken during the  <br />inspection are attached.  <br />  <br />The Division received comments from the Colorado Division of Water Resources.  A copy of the letter is  <br />attached for the Operator’s file.  <br />  <br />38.25 acre north parcel  <br />The northern 38.25 acre parcel included in the release request was observed during the inspection.  The parcel  <br />is defined by the Poudre River to the south, 35th Ave to the west and fence lines to the north and west.   <br />Cottonwood intends to retain the 0.24 acre parcel leased from Flatirons Sand and Gravel Company for access  <br />to O Street for the site.  The Flatirons parcel was not included in the 25th Ave permit boundary as part of the  <br />2012 amendment.  The total future permitted acreage for the parcel would be 38.49 acres.  <br />  <br />The northern parcel vegetation consisted of native grasses and annual weeds.  The parcel did not appear to  <br />have been disturbed by mining activities.  Cottonwood stated the area was most recently used for agricultural  <br />equipment storage by a lessee.  An oil and gas facility was observed in the middle of the parcel and residences  <br />are located north of the parcel.  <br />  <br />The City and Cottonwood will be required to transfer the Greeley West permit to Cottonwood through the  <br />Succession of Operator process as required by Rule 1.12.  Cottonwood will be required to provide a financial  <br />warranty as part of the succession process.  Cottonwood intends to lease the parcel to a mining company to  <br />mine the parcel.  An additional Succession of Operator process will be required to transfer the Greeley West  <br />permit from Cottonwood to the future leased mining company.  A technical revision to redefine the Greeley  <br />West permit area, or areas if the southeast parcel remains in the Greeley West permit, and update the mining  <br />and reclamation plans, once known, will be required by the Division.  <br />  <br />The Division will approve the release request for the north parcel from the 25th Ave Site since the parcel will  <br />remain in the Greeley West permit.    <br />  <br />25th Ave Conclusions  <br />The release of the north and southeast parcels owned by Cottonwood from the 25th Ave Site appears  <br />appropriate since both parcels will remain in the Greeley West permit.    <br />  <br />Greeley West Conclusions  <br />The release of the majority of the overlapping permit acreage with the 25th Ave Site appears appropriate once  <br />it is clarified the southeast parcel will remain in the Greeley West permit.  The bike path easement, railroad  <br />easement and 35th Ave easement acreage reductions, which have been released or excluded from the 25th Ave  <br />Site previously, as requested in the release request appears appropriate to be removed from the Greeley West  <br />permit.  The Operator must submit a separate acreage reduction request for these areas in the future.  The