Laserfiche WebLink
seeding will be used on the 6 acres that will be needed to Be reclaimed. The cost is per acre whicFi includes <br />seed and equipment. pix acres is a high estimate that will be disturbed. <br />(B) Trackhoes will be used to remove small deb, i., and kale back rock. sheer Walls that are on the west and <br />south will be left as in. we will not work ander there as ;t is too dangerous. Rock scaling will take a trackhoe <br />1 day @$500/day. Consolidate rock will meet final eclamation grade. i he cost to remove shed is $250 to <br />piCIZ up with sKiasteer and loader and put on a trailer and haul to one of our other pits. Cost of installing <br />permanent storm water controls is $2500. No fence was ever constructed �o a new one will not Be <br />constructed. Vegetation success will Be determined by the land owner and a photo point tran.,ect will be <br />used to evaluate tRe reclamation trends. <br />(d) There will Be no ponds, streams or other impoundments constructed as part of reclamation activities. TRe <br />future use of the site is planned as rangeland/wildlite Witat. All permanent man-made structures shown <br />on the Exhibit E and Exhibit L Maps will remain. There has never Been a fence on tRe east Boundary of tFie <br />permit. So no fence will Be built upon reclamation. <br />(e) i here will be no waste rock dumps, underground openings, and plant facilities constructed or used during <br />the mining activitie� and a> >och no reclamation n treatment is necessary for these items. Storage shed on the <br />mine site will be removed for reclamation. storm -water control features such as berms ditches and silt <br />fences will Be used as part of the active mining activities. S;It fencing will be removed prior to the final grade <br />operation of reclamation and disposed of offsite. Berms, ditches and haul roads will be inco, porated into the <br />final grade prior to topsoil application. TRe final grade as possible at such a vertically outcropping site will <br />have a general slope of 2:1 max in unconsolidated material. Natural BMP's will remain pa.1t reclamation. i he <br />BencHes will use Berms and swalea and sediment traps constructed out of rock from the site to aide in <br />storm -water control and erosion. It is not planned to completely mine tRe entire proposed 8.14 acres. <br />Activities will disturB approximately 6 acres total. Since large Boulders and rock may be lifted from the <br />suFface anywhere in the 8.14 acres (it desired and accessible). <br />(f) Reclamation Costs: After a period of 20 years the site will have reached a point of approximately 6 acres <br />maximum disturbance. Generally. by the date, lower slopes will have already Been graded up to a final 5ig5- <br />wall locative and final reclarr,ation activities will commence. It is estimated that a total of one ween will <br />required for the final reclamation of the .,ice. IDloat reclamation at the site will be scaling the high -wall and <br />re -grading the flatter operation., area and lower doped (and less), remove and incorporate any sediment <br />berms and ditches, and provide a fi,,al grade a, id place surface material/topsoil. An additional 2 days is <br />estimated for seed5ea preparation and seeding. Rock scaling may take a tingle day as most weathered rock <br />would have been removed already down to the competent Bedrock via the mining. <br />I otal reclamation co�tz are az follow: <br />Bulldozer (d-6 incl. moB) <br />Remove SRed <br />Rock Scaling <br />Install Permeant Storm -Water <br />Hydro Seed 6 Acres <br />Photo Point Monitoring <br />- 40 hours Ccu 175/hour=$iuuu.uu <br />- 1 day @ 800/aay =$ 800.00 <br />- =$2500.00 <br />- =$3000.00 <br />250.00 <br />Total estimated reclamation cost =$13800.00 <br />