Laserfiche WebLink
GVB-5A <br />0.5 <br />0.1 <br />Needs weed management for <br />thistle and houndstoungue. Phase <br />1,11 ok for release of pad. <br />GVB-6B <br />0.5 <br />NA <br />NA <br />GVB-4A <br />0.5 <br />NA <br />Phase 1,11 ok for release of pad. No <br />road construction (0.5ac per). <br />KM -3 <br />1,11 <br />0.5 <br />0.5 <br />Needs weed management for <br />thistle. Phase 1,11 ok for release. <br />GVB-D1-A <br />1,11 <br />0.3 <br />0.5 <br />NA <br />GVB-WD3-B <br />1,11 <br />0.5 <br />NA <br />Phase 1,11 ok for release of pad. No <br />road construction (0.6AC per). <br />GVB-WD3-A <br />1,11 <br />0.5 <br />NA <br />Phase 1,11 ok for release of pad. No <br />road construction (0.2ac per) <br />GVB-WD2-A <br />1,11 <br />0.5 <br />0.1 <br />NA <br />2011-2 <br />1,11 <br />1.0 <br />0.23 <br />NA <br />SS -7 <br />1,11 <br />1.0 <br />NA <br />Needs weed management. Phase <br />1,11 ok for release of pad. No road <br />construction (1.7 ac per) <br />BRL-2012-1 <br />1,11 <br />1.0 <br />0.3 <br />Needs weed management for <br />oxeye daisy. Phase 1,11 ok for <br />release of pad. <br />BRL-2010-2 <br />1,11 <br />0.5 <br />NA <br />NA <br />Proposed Phase 1,11, and III <br />Phase <br />Acres <br />Acres <br />Comment <br />Requested <br />(pad) <br />(road) <br />Geo -Tech -04 <br />1,11,111 <br />NA <br />NA <br />DHAR not required. Hole destroyed <br />during Hubbard Creek Shaft <br />construction. Pad disturbance <br />with Hubbard Creek Shaft. No Road <br />or pad disturbance associated. <br />Phase 1,11,111 ok for release. <br />HC -08-02 <br />1,11,111 <br />NA <br />NA <br />Hole Drilled on Hubbard Creek <br />Road. No Phase 11 or III criteria <br />Phase 1,11,111 ok for release. <br />GVB-BA-B <br />1,11,111 <br />NA <br />NA <br />Pad and road bonded under GVB- <br />8A. No Phase 11, 111 requirement. <br />Phase 1,11,111 ok for release. <br />`pF • Cp1t] �. <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 <br />