Laserfiche WebLink
December 22, 2015 C-1980-007/West Elk Mine LDS <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />Beavers Construction, of Hotchkiss, are contracted to haul refuse; they operate two haul trucks at the West <br />Elk mine, at least one of which is equipped with snow chains. Process waste was being hauled from the prep plant <br />and stockpiled at both the Refuse Pile Expansion (RPE) Area and the Refuse Pile Expansion East (RPEE) Area. <br />(MCC also has a haul truck, which is generally kept in reserve to provide surge capacity) <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />PHOTOGRAPHS <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 3 <br />