Laserfiche WebLink
COLORADO DIVISION OF RECLAMATION, MJNING AND SAFETY <br />1313 sherman Street, ltouiu z13, heaver, Loloraau Suzus ph(.Ai) 856-j35/ <br />/tf 7v <br />File No.: lvi- M-2009-0 t6 site Name: Hukill Gulch Millsite <br />County <br />Clear Creek <br />TR# (DRMS Use onW <br />Permittee: Venture Resources Inc. <br />TR02 <br />Operator (If Other than Permittee): <br />V(,'urjyvlieZ! <br />Permittee Representative: Patrick L.J. Maher <br />U hul��tiuns �OF <br />Please provide a brief description of the proposed revision: WWAWWW <br />Gotnmenuement of gra-and water monitoring program. Please see the attached proposal. <br />RECEIVED <br />EIEC 2 9 Z015 <br />As defined by the minerals xules, a i echnical xevision ( ix) is: "a change in tree permit or application <br />which does not have more than a minor effect upon the approved or proposed Keclamatiun or <br />Environmental Protection Plan.7', The Division is charged with determining if the revision as submitted <br />meets this definition. if the nivision determines that the pruposed revision is beyond the scope of a ilk, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />e/.pedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable Within 30 days. If the Division requires additional information to approve a <br />TK, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies; the Division must deny the TR unless the <br />permittee requests additional time, in writing; to provide th. .eguied information. <br />1'here is no pre-detlned format for the submittal of a TK; however, it is up to the permittee to provide <br />sufficient intormation to the liivision to approve theTR R request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested '1'K. <br />xequircd rocs fur 1 echnical xevision by Permit Type -Please mark the currect tee and submit it with <br />yuui request fur a 1et;hnical xevision. <br />Permit - meuuirca 'i'myye Submitted (mark only unc) <br />110c, 111, 112 cunstruvtiun E]materials, and 112 quarries $210 <br />112 hard ruck (n„ t DMO) $175 ❑ <br />110d, 112d(1, 2 or 3) $1006❑ <br />