Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 005 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: COLORADO SPRINGS <br />Total one-way travel distance: 25.00 miles <br />Average Travel Speed: 50.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />$3,007.43 <br />$0.00 <br />Non- <br />Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />NA <br />0.50 <br />NA <br />2.00 <br />1.00 <br />Total job time: <br />4.00 Hours <br />Total job cost: $3,007 <br />CIRCES Cost Estimating Software <br />