Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Cost Summary <br />Site: Hale Pit aka Earl's Pit Permit Action: 2015 Update Permit/Job#: M1981121 <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: 12/9/2015 <br />User: TC1 <br />State: Colorado <br />County: El Paso <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M121-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />004 <br />005 <br />Reduce Highwalls to 3H:1V <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />5.13 <br />$1,073.00 <br />$1,341.00 <br />$8,420.00 <br />$3,007.00 <br />Replace Topsoil (6" over 6.63 acres) <br />DOZER <br />6.41 <br />Reveg Disturbed Area (6.63 ac) <br />REVEGE <br />12.00 <br />Mob/Demob Equipment from CS <br />MOBILIZE <br />4.00 <br />SUBTOTALS: <br />27.54 <br />$13,841 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $279.59 <br />Performance bond: 1.05 Total = $145.33 <br />Job superintendent: 14.42 Total= $1,083.81 <br />Profit: 10.00 Total= $1,384.10 <br />TOTAL 0 & P = $2,892.83 <br />CONTRACT AMOUNT (direct + O & P) = $16,733.83 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 5.00 <br />Total = 0.00 <br />Total = $0.00 <br />$836.69 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $3,729.52 <br />TOTAL BOND AMOUNT (direct + indirect) = $17,570.52 <br />