My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-24_PERMIT FILE - M2007058
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007058
>
2015-12-24_PERMIT FILE - M2007058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 6:10:48 PM
Creation date
12/24/2015 12:55:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007058
IBM Index Class Name
Permit File
Doc Date
12/24/2015
Doc Name
Review Items for Permit
From
C & B Sand & Gravel
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(m) Specify whether the deposit will be processed on-site. <br /> As stated in (e)4 above,there are plans to provide for a portable crusher or screening plant to process <br /> material at this site. All material will be handled onsite using tracked excavators bulldozers and front-end <br /> loaders to temporarily stockpile and load to haul trucks. Material stockpiles may be produced and reduced <br /> on a daily basis or will be conveniently located adjacent to or on land owned by owner which is next to the <br /> active mine pit areas as excavation activities proceed. One storage shed will be on proposed site. <br /> (n) Primary and secondary commodities to be mixed/extracted and intended use. <br /> The primary commodities to be mined onsite will be large boulders, rock,and crushed rock for sand and <br /> gravel and backfill soil. The intended use of these materials will be as river stabilization boulders, structural <br /> rip-rap,crushed rock and road gravel base course and fill material for road construction activities.There are <br /> no secondary commodities to be minded and/or extracted at this site. <br /> (o) Incidental products to be mined and/or extracted. <br /> There are no incidental products to be mined and/or extracted by the proposed operations <br /> (p) Blasting <br /> Blasting will be used to loosen rock so it may be moved with tracked excavators, bulldozers and front-end <br /> loaders.An outside third part will be hired for blasting. <br /> On recommendation by Division of Reclamation Mining and Safety the geotechnical stability exhibit will not <br /> be required because of the location and type of rock. <br />
The URL can be used to link to this page
Your browser does not support the video tag.