Laserfiche WebLink
Interoffice Memorandum <br />To: Rob Zuber <br />From: Zach Trujillo <br />Subject: Colowyo — PR -04 <br />Date: 12/23/15 <br />••• <br />I have reviewed Colowyo's responses to my preliminary adequacy review and have the following comments: <br />• Item 9. Colowyo has provided an updated and correct reference to access road location and construction under <br />4.03.2 Access Roads, Page 2. This item has been satisfied and no additional comments are necessary. <br />• Item 31. Colowyo has provided the missing page D-2. Page D-2 is an intentional blank page for potential future <br />text. This item has been satisfied and no additional comments are necessary. <br />• Item 32. Colowyo has provided updated Figures D1 and D2 to include embankment slope design of 1.5h:1v as <br />required by Rule 4.03.2(3)(e)(viii). This item has been satisfied and no additional comments are necessary. <br />• Item 38. Colowyo has provided an updated Exhibit 23, Item 2 with a corrected unit weight for the south end of <br />the fill. This item has been satisfied and no additional comments are necessary. <br />This concludes my review of Colowyo's responses to my preliminary adequacy comments to PR -04. If you have any <br />questions, please feel free to contact me. <br />Sincerely, <br />Zach Trujillo <br />