Laserfiche WebLink
12/23/2015 State.co.us Executive Branch Mail -Re: Twentymile Coal, LLC- Foidel Creek Mine -MR 15-291 13 -Left OUtby Utility Borehole Completeness Response <br />MINIVAIMM <br />jnettleton@peabodyenergy.com <br />From: Ebert- DNR, Jared [mailto:jared.ebert@state.co.us] <br />Sent: Monday, December 21, 2015 4:18 PM <br />To: Nettleton, Jerry <br />Cc: Alysha Hernandez - DNR <br />Subject: Re: Twentymile Coal, LLC - Foidel Creek Mine - MR15-291 13 -Left OUtby Utility Borehole <br />Completeness Response <br />Jerry, <br />have not received the hard copy of your completeness review response with the necessary map, thus I have <br />not deemed the application complete. However, in order to expedite the process I have reviewed all of the <br />application material that I have received. Below are items that will need to be addressed prior to approval of <br />the MR291 application. <br />1. TC revised permit pages 2.04-9.1 and 9.2 with MR292. MR292 added a new section specifically for <br />the 13LT Outby Utility Borehole cultural resource survey. The originally proposed revised pages submitted <br />with MR291 did not take MR292 into account. Page 2.04-9.1 no longer needs to be revised, but page 2.04-9.2 <br />needs to be revised to add a discussion about the results of the cultural resource survey that was conducted <br />under the new section created for this project with MR292. <br />2. Proposed revised pages 2.05-45.29 and 2.05-84.13, indicates a maximum of 1.0 feet of soil material <br />from the road and pad disturbed area will be recovered and stockpiled. Based on Map 17 of the permit, the <br />new proposed road falls within a portion of soils unit 50E and D10 and the pad area falls within soil unit D10. <br />The average soil thickness for soils unit D10 and 50E is 30 inches and 18 inches respectively. Given this, <br />the soils recovery plan does not appear to be adequate. Please revise the soils recovery and storage plan to <br />salvage all available topsoil. Please revise the above referenced pages accordingly. Also, please update <br />Table 49A with the revised estimate of topsoil to be salvaged. <br />3. The first paragraph of proposed revised page 2.05-106.1 does not follow with the paragraph from the <br />previous page. Please revise these pages for consistency. <br />Once I get the hard copy of your response, I will deem the application complete. Please let me know if you <br />have any questions. <br />hftps://mail.google.com/mail/u/0/?ui=2&ik=e29129fcb5&vi ew=pt&search= i nbox&th=151 cbd922138814f&si m 1=151 cbd922138814f 2/4 <br />