Laserfiche WebLink
9. Estimated acres to be reclaimed in the next report year: <br />10. Total acres in various stages of reclamation, since pennitted exploration activities began: <br />Page 4 of 6 <br />0 <br />Total acres <br />backfilled: <br />o <br />Total acres <br />seeded w/ <br />0 <br />Total acres <br />w/topsoil <br />A <br />Total acres <br />mulched w/ <br />0 <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />0 <br />fertilized w/ <br />apvd fertilizer: <br />0 <br />replacement <br />depth (in.): <br />a <br />rate (tons/ac): <br />0 <br />Seed <br />application <br />N <br />/A <br />Fertilizer <br />application <br />N <br />/A <br />Mulch <br />application <br />^//A <br />method: <br />method: <br />method: <br />11. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO E� <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOI? <br />If "NO", please explain: <br />YES NO <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO <br />If "NO" please explain: <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO /A` <br />15. Are all hazardous materials stored within approved spill containment structures? YES <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring <br />annually? YES <br />NO e <br />enation <br />i N/A <br />If "Yes", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in place <br />and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: M eWl E S N trL D S Y 145. O E PAR-iM WT <br />of Evvect. <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />Ar THE REquES-r or -rge u.5. DEPg77M-Jr OF EtoEgt,Y TOEEE- ims <br />Beeiv ivo arc oLoup 0137 ti 9.0A14C ' O R O #+ER AC7tvITy ON Tim' Ptivi rT <br />