Laserfiche WebLink
M <br />L,)rqk L. lnc lioa,d may suspend or revoke this permit, or assess a civil penalty, upon a fmding that the permittee <br />violated the tenns or conditions of this permit, the Act, the Mineral Ru1c3 a..d R%.lations, u, that ;,.fc,.,nation <br />contained in the applicatio., o, you. pc.luit nu3,c1„e3uut i.uportaut mate,iaai fact,); <br />1'l R 3. if you, n,iuug arra ,eelamation operations affect areas beyond the boundaries of an approved permit <br />bou,.3ary, substantial civil penalties, to you as permittee can result; <br />4. Any modification to the app.ovcd...ilail,g and,eclamatim, plan fro,., tn005c 3e5vrioea i,i you, approved <br />applicatio., .c.lui,e3 you to 5ub,,,it a pc,u,it .nuaiI.catiou arra obta;a approval from the Board or Office; <br />1t is your responsibility to notify the Office of any changes in your address or phone number; <br />6. Upon permit issuance and p,iv. to bcc6i.u.in6 un -site nuui,.6 activity, you must post a sign at the entrance of <br />the 11111,c 3itc_ Which 5ha11 be ncarly visible trunn the access road, with the following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a 5tatcn.'cut that a ,ccla,uatiuu pe,n,it t0. the operation has been issued by the Colorado Mined Land <br />KWIC natio.. hoard: and, <br />C. the permit number. <br />1 ne boun8a. ies of the pen -nit boundary area must be marked by monuments or other markers that are clearly <br />visible and adequate to delineate such boundaries prior to site disturbance. <br />It 13 a p,uvi5.v11 of tni3 pC....it tnat the ope.atious will be conducted in accordance with the terms and <br />cunaition5 ii5te3 i„ youi application, as well as with the provisions of the Act and the Construction Material Rules <br />` and Regulations in effect at the time the pennit is issued. <br />W 9. Annually, o.. the anm,rL3aiy date of pe, mit issuance, yvu must sub,nit an a.u.ual fee as specified by Statute, <br />a..d as a,,,,ual ,epo.t whicn lunude5 a snap aesc,ibing tie acreage affected and the acreage reclaimed to date (if <br />ttr--.c a.e cnanges from the previous year), any monitoring required by the Reclamation Plan to be submitted <br />annually on the anniversary date of the permit approval. Annual fees are fo. the p,c viuus year a pc....it i5 held. r o, <br />example, a permit with the a=Vu:saiy date of July 1, 199D, the annual ter, j.5 Iv, the peiiVZ1 oT July 1, 1994 through <br />Juuc 30, 19yD. railu,c to submit your annual fee and report by the permit anniversary date may result in a civil <br />pe..alty, .evocation of your pen -nit, and forfeiture of your financial warranty. It is your responsibility, as the <br />permittee, to continue to pay your annual fee to the Office until the Board. eleasusyou from yuu, rtal,eclau.ativ., <br />q� responsibility. <br />lu. r�r jvi,.t ventu,elpartne.srri ope.ators: the signing representative is authorized to sign this document and a <br />power of attorney (provided by the p=er(s)) authorizing the signature of the representative is attached to this <br />application. <br />