Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 9 of 9 <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non- <br />Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.16 <br />0.16 <br />0.16 <br />0.16 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.32 <br />0.32 <br />$3,905.34 <br />$155.30 <br />Total job time: 2.64 Hours <br />Total job cost: $4,061 <br />CRCES Cost Estimating Software <br />