My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-17_INSPECTION - M1981022
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1981022
>
2015-12-17_INSPECTION - M1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:31 PM
Creation date
12/22/2015 10:28:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981022
IBM Index Class Name
Inspection
Doc Date
12/17/2015
Doc Name
Inspection Report
From
Connell Resources, Inc.
To
DRMS
Inspection Date
12/20/2015
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/Demob Equipment from CS <br /> Site: Hale Pit aka Earl's Pit Permit Action: 2015 Update Permit/Job#: M1981121 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 12/9/2015 County: El Paso Filename: M121-005 <br /> User: TC1 <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRA4TOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $16.63 $18.37 $22.33 <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> Operator Cost/Hour: $27.66 $27.66 $27.66 <br /> Helper Cost/Hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D8T-8U 48.33 $62.67 $117.55 1 $180.22 $117.55 $250.00 <br /> Drill/Broadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $7.03 $88.67 1 $95.70 $88.67 $250.00 <br /> (Reinco M90) <br /> Subtotals: $404.18 $294.89 $750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Subtotals: $0.00 $0.00 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.