Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#001 Page 2 of 2 <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 1.516 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.902 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 1.0300 <br /> Adjusted unit production: 1,675.81 LCY/hr <br /> Adjusted fleet production: 1675.81 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.125/LCY <br /> Total job time: 5.13 Hours <br /> Total job cost: $1,073 <br />