Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Hale Pit aka Earl's Pit Permit Action: 2015 Update Permit/Job#: M1981121 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 12/9/2015 County: El Paso Filename: M121-000 <br /> User: TC 1 <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet ± Task <br /> Description Used Size Hours Cost <br /> 001 Reduce Highwalls to 3H:1V DOZER 1 i 5.13 $1,073.00 <br /> 002 Replace Topsoil(6" over 6.63 acres) DOZER 1 6.41 $1,341.00 <br /> 004 Reveg Disturbed Area(6.63 ac) REVEGE 1 t 12.00 $8,420.00 <br /> 005 Mob/Demob Equipment from CS MOBILIZE 1 4.00 $3,007.00 <br /> SUBTOTALS: 27.54 $13,841 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $279.59 <br /> Performance bond: 1.05 Total= $145.33 <br /> Job superintendent: 14.42 ' Total= $1,083.81 <br /> Profit: 10.00 Total= $1,384.10 <br /> TOTAL IO&P= $2,892.83 <br /> CONTRACT AMOUNT(direct+ &P)= $16,733.83 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00 j Total= $0.00 <br /> Reclamation management and/or administration: 5.00 $836.69 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $3,729.52 <br /> TOTAL BOND AMOUNT(direct+indirect)= $17,570.52 <br />