Laserfiche WebLink
December 16, 2015 <br />Horse Gulch Fill Quarterly Inspection Report <br />Fourth Quarter 2015 <br />Table of Contents <br />i <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />2.2 Placement of Underdrainage Systems <br />2.3 Installation of Surface Drainage Systems <br />2.4 Placement and Compaction of Fill Materials <br />2.5 Revegetation <br />3.0 References <br />I certify that this report was prepared by me. <br />1 <br />FA <br />4 <br />4 <br />4 <br />4 <br />5 <br />6 <br />1 <br />x\-\\ 0 Uge".111111 <br />i Q' �• Z <br />i <br />i Z i <br />43864 0):�_ <br />Tonic Marie Perkins <br />�° <br />i p;, lee, <br />CO PE 43864(sO•••.••••'� <br />Mining Engineer <br />%, ON ON P. <br />Trapper Mining, Inc. <br />1 <br />FA <br />4 <br />4 <br />4 <br />4 <br />5 <br />6 <br />