My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1996084 (3)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996084
>
_INSPECTION - C1996084 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 8:03:59 AM
Creation date
12/21/2015 10:15:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Inspection
Doc Name
Inspection Report (Revised)
From
DRMS
To
New Elk Coal Company, LLC
Inspection Date
12/15/2015
Email Name
RDZ
JRS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 16,2015 C-1996-084/Lorencito Canyon Mine RDZ <br /> Rock has been stockpiled by NECC to repair the Fill 7 east side ditch. As noted in past inspection reports,the <br /> west ditch of Fill 9 could also use repair. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3) <br /> Drainage 4.03.1(4)/4.03.2(4) <br /> Surfacing and Maintenance4.03.1(5) and(6)/4.03.2(5)and(6) <br /> Reclamation 4.03.1(7)/4.03.2(7): <br /> The road to Pond 8 needs to be improved, at the lower end,per previous inspections. Other roads around the site, <br /> including the road to Pond 5,were in adequate condition. The road to Pond 6 is functional,but a culvert at the <br /> drainage crossing is highly recommended to reduce maintenance costs (of both the road and the pond below). <br /> RECLAMATION SUCCESS -Rule 4.15,Rule 3: <br /> On the west slope of the hill northwest of Fill 9 (known as "the nob")there are big rills that NECC plans to repair <br /> with branches. <br /> On the slope above the area where pond cleanings are placed, the wattles appeared to be in good shape (as viewed <br /> from the road), and the rills are stabilizing. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.