Laserfiche WebLink
November 24,2015 C-1982-056/Foidel Creek Mine JLE <br /> Construction 4.03.1(3)/4.03.2(3) <br /> Drainage 4.03.1(4)/4.03.2(4) <br /> Surfacing and Maintenance4.03.1(5) and(6)/4.03.2(5) and(6) <br /> Reclamation 4.03.1(7)/4.03.2(7): <br /> The various haul roads throughout the main facilities area appeared stable and well maintained. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> The belt-out-back pile appears to have been active at the time of the inspection. The area appears stable and no <br /> problems were noted. <br /> The main facilities area,parking area,office,various storage areas,warehouse,wash-plants,etc.were observed. <br /> No problems were noted. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> It appears that TC is continuing to strip topsoil in the coal refuse disposal expansion area east of the Phase 1 area. <br /> Topsoil was actively being placed in the new CRDA topsoil stockpile area. It appears a berm or some type of <br /> sediment containment barrier has been installed or constructed downslope of the new topsoil stockpile area. <br /> DOCUMENTS RECEIVED <br /> OTHER(SPECIFY) <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 15 <br />