Laserfiche WebLink
t <br /> • Page 4 of 5 <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil op&crvs mulched w/ <br /> l Acres approved mix: Act-* re laced: approved mulch: <br /> Total acres Total acres Topsoil =(tons/ac): <br /> h application <br /> graded: fertilized w/ 1replacement N 1 A <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application Q r Sq application N( � application N t p� <br /> method: method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? E NO N/A <br /> If"YES", indicate the weed species,control area,control type,application rate and treatment a e on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? CSNO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? ES NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved minii g plan and Office of th to <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? NO N/A <br /> 19. Is your basis for legal right to enter still valid? NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Recla ation Act for the Extraction of <br /> Construction Materials(C.R.S. 34-32-116 or 34-32.5-116),attach a map to this report at accurately depicts the permit <br /> boundary, current affected area boundary and location of the acreages specified in ite s 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br />