Laserfiche WebLink
18. Over the last year we have graded and reopened the perviously existing road to access the <br /> mine. We have also started trenching from the south end heading north as shown on updated <br /> map. A top soil stock has been started on the west side of the trench along with a rock/tailing <br /> pile east side of the the trench. <br />