My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-11_REPORT - P2014013
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2014013
>
2015-12-11_REPORT - P2014013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 3:53:36 AM
Creation date
12/15/2015 4:46:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014013
IBM Index Class Name
REPORT
Doc Date
12/11/2015
From
Smash Bros Explorations
To
DRMS
Annual Report Year
2015
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 6 <br /> 9. Estimated acres to be reclaimed in the next report year: o S <br /> 10. Total acres in various stages of reclamation,since permitted exploration activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ O w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: I fertilized w/ replacement �A rate(tons/ac): N AN <br /> J a vd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application application application <br /> method: method: VJ A method: <br /> 11. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N/A <br /> If"YES",indicate the weed species,control area,control type,application rate and treatment date on the report map. <br /> 12. Is adequate topsoil reserved for reclamation,based on your approved NOV YES NO N/A <br /> If"NO",please explain: <br /> 13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br /> If"NO"please explain: <br /> 14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of th <br /> State Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO N/A <br /> 15. Are all hazardous materials stored within approved spill containment structures? :J NO CN : <br /> 16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring information <br /> annually? YES NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br /> 17. As required by Rule 5.6(1)(g)submit with this report documentation to show that the Financial Warranty is still in place <br /> and is adequate to fully reclaim the approved prospecting site disturbance(s). <br /> FINANCIAL WARRANTY DOCUMENTATION ATTACHED: <br /> 18. Please use the space below to describe as required by Rule 5.6(l)(c)any new prospecting activity that occurred during <br /> the preceding year, including the locations and number of new surface drill holes,mud pits, excavations,rock dumps, <br /> adits, shafts,trenches,pits,roads and structures. If applicable,you must also describe the measures taken to safeguard <br /> shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br /> should be attached if needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.