My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-08_REPORT - M2006039
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2006039
>
2015-12-08_REPORT - M2006039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 3:17:18 AM
Creation date
12/15/2015 4:45:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006039
IBM Index Class Name
Report
Doc Date
12/8/2015
From
North Clear Creek Construction
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Annual Fee/Report
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron <br /> Julie Justus Chevron North America <br /> Regulatory, Health & Exploration and Production Company <br /> 0, Environment Specialist (A Chevron U.S.A. Inc. Division) <br /> MCBU 760 Horizon Drive Suite 401 <br /> Grand Junction, Colorado 81506 <br /> Telephone: 970.257.6042 <br /> Email: jjustus@chevron.com <br /> November 30, 2015 <br /> Division of Reclamation, Mining and Safety <br /> Attn: Minerals Program <br /> 1313 Sherman St., Room 215 <br /> Denver, Colorado 80203 <br /> Re: Annual Report and Annual Fee <br /> Chevron Shale Oil Company, a division of Chevron U.S.A. Inc. <br /> Permit No. M-2006-039 North Clear Creek Construction Materials Mine <br /> Garfield County, Colorado <br /> In accordance with the regulations of the Division of Reclamation, Mining and Safety, Chevron <br /> U.S.A. inc. hereby files its annual report and annual fee for the subject mine. <br /> Preceding Year <br /> It has been brought to my attention that the CDRMS has not received the 2014 Annual Report <br /> for the Chevron Clear Creek Material Mine. Please find enclosed the 2014 Annual Report, Map, <br /> Fee, and copy of the DRMS letter granting a one-time 30-day grace period effective November <br /> 19, 2015. <br /> The North Clear Creek Construction Materials Mine was opened in March of 2008 and the mine <br /> has been in operation since that time. No material was removed from the mine FY 2014 and no <br /> new reclamation or revegetation activities were initiated. A noxious weed control program has <br /> been in place since the inception of the mine and the site is regularly monitored for noxious <br /> weeds. No weed treatments were necessary or conducted at the mine in 2014. Existing <br /> stormwater management controls are monitored at regular intervals and maintained as needed. <br /> The Mine is currently in Intermittent Operation status as approved by CDRMS in November of <br /> 2012. <br /> A check in the amount of $323.00 for the annual fee, along with a survey map of the current <br /> mine showing the disturbed areas are enclosed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.