My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-10_HYDROLOGY - C1981035
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981035
>
2015-12-10_HYDROLOGY - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:15 PM
Creation date
12/10/2015 12:44:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Hydrology
Doc Date
12/10/2015
Doc Name
4th Quarter 2015 Field Well Water Analysis (King I & King II)
From
GCC Energy
To
DRMS
Permit Index Doc Type
Other Ground Water
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dzufelt@greenanalytical.com p: 970.247.4220 f: 970.247.4227 75 Suttle Street Durango, CO 81303 <br />www.GreenAnalytical.com <br />GCC Energy, LLCProject:King I & King II <br />6473 CR 120Project Name / Number:King I & King II <br />Reported: <br />Hesperus CO, 81326Project Manager:Tom Bird12/04/15 13:15 <br />ANALYTICAL REPORT FOR SAMPLES <br />Sample IDLaboratory IDMatrixDate SampledDate Received <br />Wiltze Well1511104-01Water11/10/15 11:3511/10/15 15:13 <br />#1 Upgradient1511104-02Water11/10/15 12:1011/10/15 15:13 <br />#2 Downgradient1511104-03Water11/10/15 12:2411/10/15 15:13 <br />#3 Hay Gulch Ditch1511104-04Water11/10/15 12:5511/10/15 15:13 <br />Green Analytical Laboratories <br />The results in this report apply to the samples analyzed in accordance with the chain of <br />custody document. This analytical report must be reproduced in its entirety. In no event <br />shall Green Analytical Laboratories be liable for incidental or consequential damages. <br />GALs liability, and clients exclusive remedy for any claim arising, shall be limited to the <br />amount paid by client for analyses. All claims, including those for negligence and any other <br />cause whatsoever, shall be deemed waived unless made in writing and received within <br />thirty days after completion of the applicable service. <br />Debbie Zufelt, Reports Manager <br />Page 1 of 9 <br />Page 2 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.