Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> CQA ACTIVITIES: <br /> I) Field Activities: <br /> The following activities were observed: Geomembrane QA/QC; Drain Cover Fill placement; underground <br /> working remediation; and pump monitoring at the LVSCS riser pipes. <br /> II) Laboratory Activities: <br /> Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br /> continued. <br /> General Project Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held November 17, 2015 (Amec Foster Wheeler, CC&V, Ames). <br /> Amec Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br /> Contractor Meeting. <br /> Ames daily safety meetings <br /> Amec Foster Wheeler daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br /> Wheeler, and Ames. <br /> Deliveries: None. <br /> CQA Monitor <br /> Submitted by: Date: November 23, 2015 <br /> Bobby Redd, El <br /> Project Resident <br /> Reviewed by: _ Date: <br /> CC&V Projects <br /> Reviewed By: 7 i(- (/� .��'` Date: r <br /> Reviewed By: Date: <br />