Laserfiche WebLink
111111111111 111111 111111111111111111111 III 1111111111111 <br />3591169 11/21/2008 02:18P Weld County, CO <br />KerrAtGee 21 of 22 R 111.00 0 0.00 Steve Moreno Clerk & Recorder <br />General Guidelines for Design and Construction Activities On or Near <br />Kerr- McGee Gathering LLC and Kerr - McGee Oil & Gas Onshore LP <br />Pipelines and Related Facilities <br />• Heavy equipment will not be allowed to operate directly over KMG pipelines or in KMG ROW unless written approval is <br />obtained from KMG. Heavy equipment shall only be allowed to cross KMG pipelines at locations designated by KMG. Haul <br />roads will be constructed at all crossings. The haul roads will be constructed using lightweight equipment. The existing <br />depth of cover over the pipeline must be verified. Cover will be added such that a total of 8' of fill exists over the pipeline <br />and extends a minimum of 10' on each side of the pipeline. Depth of cover will then taper as required for equipment <br />access. Steel plates may be used for load dissipation only if approved in writing by KMG. <br />• Contractor shall comply with all precautionary measures required by KMG,at it's sole discretion to protect Its pipelines. <br />When inclement weather exists, provisions must be made to compensate for soil displacement due to subsidence of tires. <br />• Excavating or grading which might result in erosion or which could render the KMG ROW inaccessible shall not be <br />permitted unless the contractor agrees to restore the area to its original condition and provide protection to KMG's facility. <br />At no time will cover be reduced to less than 36" without written approval by KMG and a KMG representative on site. <br />• A KMG representative shall be on-site to monitor any construction activities within twenty-five (25) feet of a KMG pipeline or <br />aboveground appurtenance. The contractor shall not work within this distance without a KMG representative being on <br />site. Contractor shall use extreme caution and take any appropriate measures to protect KMG facilities. <br />+ Ripping is only allowed when the position of the pipe is known and not within ten (10) feet of KMG facility. KMG personnel <br />must be present. <br />Temporary support of any exposed KMG pipeline by Contractor may be necessary if required by KMG's on-site <br />representative. Backfill below the exposed lines and 12° above the lines shall be replaced with sand or other selected <br />material as approved by KMG's on-site representative and thoroughly compacted in 12" lifts to 95% of standard proctor dry <br />density minimum or as approved by KMG.'s on-site representative. This is to adequately protect against stresses that may <br />be caused by the settling of the pipeline. <br />• No blasting shall be allowed within '1000 feet of KMG's facilities unless blasting notification is given to KMG Including <br />complete Blasting Plan Data. A pre -blast meeting shall be conducted by the organization responsible for blasting. <br />KMG shall be indemnified and held harmless from any loss, cost of liability for personal injuries received, death caused or <br />property damage suffered or sustained by any person resulting from any blasting operations undertaken within 500 feet of <br />its facilities. The organization responsible for blasting shall be liable for any and all damages caused to KMG's facilities as <br />a result of their activities whether or not KMG representatives are present. KMG shall have a signed and executed Blasting <br />indemnification Agreement before authorized permission to blast can be given. <br />No blasting shall be allowed within 200 feet of KMG's facilities unless blasting notification is given to KMG a minimum of <br />one week before blasting. The organization responsible for blasting must complete Blasting Plan Data. KMG shall review. <br />and analyze the blasting methods. A written blasting pian shall be provided by the organization responsible for blasting <br />and agreed to in writing by KMG. A written emergency plan shall be provided by the organization responsible for blasting. <br />KMG shall have a signed and executed Blasting indemnification Agreement before authorized permission to blast can be <br />given. A pre -blast meeting shall be conducted by the organization responsible for blasting. <br />• Any contact with any KMG facility, pipeline, valve set, etc. shall be reported immediately to KMG. If repairs to the pipe are <br />necessary, they will be made and inspected before the section is re -coated and the line is back-filled. <br />KMG personnel shall install all test leads on KMG facilities. <br />Local Kerr-McGee Gathering LLC Representation: <br />Manager of Construction & Facilities Engineering: Kevin R. Osif, P.E. <br />Facilities Engineer. Joseph E. Sanchez, P.E. <br />Foreman 1: James Phillips <br />Foreman 1: Rick Noffsinger <br />Phone: 303 655 - 4307 <br />Phone: 303 655 - 4319 <br />Phone: 303 855 - 4343 <br />Phone: 303-655 - 4326 <br />Page 3 of 4 Revision 3/01/2004 <br />