My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-09_PERMIT FILE - M2015030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015030
>
2015-12-09_PERMIT FILE - M2015030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:15 PM
Creation date
12/10/2015 8:16:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015030
IBM Index Class Name
PERMIT FILE
Doc Date
12/9/2015
Doc Name
Structure Agreements
From
Asphalt Specialties
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111111111111111111111111111111111111111 of niiii Ni uii <br />3591169 11/21/2008 02:181' Weld County, CO <br />KerrA tGee 19 of 22 R 111.00 D 0.00 Steve Moreno Clerk & Recorder <br />General Guidelines for Design and Construction Activities On or Near <br />Kerr- McGee Gathering LLC and Kerr - McGee Oil & Gas Onshore LP <br />Pipelines and Related Facilities <br />This list of design, construction and contractor requirements, Including but not limited to the following, is for the design and <br />installation of foreign utilities or improvements on Kerr McGee Gathering LLC (KMG) right-of-way (ROW). These are not <br />intended to, nor do they waive or modify any rights KMG may have under existing easements or ROW agreements. For <br />information regarding KMG's rights and requirements as they pertain to the existing easements, please reference existing <br />easements and amendments documents. This list of requirements is applicable for KMG facilities on easements and in road <br />rights of ways only. Encroachments on fee property should be referred to the Land & ROW Department. Any reference to KMG <br />in the below requirements is meant to include and apply to any Kerr McGee entity. <br />Design <br />• KMG shall be provided sufficient prior notice of planned activities involving excavation, blasting, or any type of construction <br />on KMG's ROW or near its facilities. This is to determine and resolve any location, grade or encroachment problems and <br />allow for the protection of KMG's facilities and the general public. This prior notification is to be made before the actual <br />work is to take place. <br />• The encroaching entity shall provide KMG with a set of drawings for review and a set of final construction drawings <br />showing all aspects of the proposed facilities In the vicinity of KMG's ROW. The encroaching entity shall also provide a set <br />of "as -built drawings" and submit to KMG, showing the facilities in the vicinity of KMG's ROW upon completion of the work. <br />• Only facilities shown on drawings reviewed by KMG will be approved for installation on KMG's ROW. All drawing revisions <br />that affect facilities proposed to be placed on KMG's ROW must be approved by KMG in writing. <br />KMG shall approve the design of all permanent road crossings. <br />Any repair to surface facilities following future pipeline maintenance or repair work by KMG on it's "prior rights" ROW will be <br />at the expense of the developer or landowner. In addition, any repair to surface facilities following future pipeline <br />maintenance or repair work by KMG on replacement ROW granted to relocate KMG facilities will also be done at the <br />expense of the developer or landowner unless expressly addressed in surface use agreements and approved in writing by <br />KMG. <br />• The depth of cover over the KMG pipelines shall not be increased or reduced nor surface modified for drainage without <br />KMG's written approval. <br />• Construction of any permanent structure within KMG pipeline easement is not permitted without written approval by KMG. <br />• Planting of shrubs and trees is not permitted on KMG pipeline easement without written approval by KMG. <br />• Irrigation equipment i.e. backtiow prevent devices, meters, valves, valve boxes, etc. shall not be located on KMG easement <br />without written approval by KMG. <br />Foreign utility installations, IE, distribution gas, oil and gas gathering, water, electric, telephone, cable and sewer tines, etc., <br />may cross perpendicular to KMG's pipeline within the ROW, provided that a minimum of eighteen inches (18") of vertical <br />clearance is maintained between KMG pipeline(s) and the foreign utility. Any installation by a foreign utility with less than <br />18" of vertical separation is not allowed without written approval by KMG. In no case will vertical separation be less than <br />12" whether written or not. Constant line elevations must be maintained across KMG's entire ROW width, gravity drain lines <br />are the only exception and must be approved in writing. Foreign line crossings below the KMG pipeline must be evaluated <br />by KMG to ensure that a significant length of the KMG line is not exposed and unsupported during construction. Foreign <br />line crossings above the KMG pipeline with less than 18" of clearance must be evaluated by KMG to ensure that additional <br />support is not necessary to prevent settling on top of the KMG natural gas pipeline. A KMG representative must be on site <br />during any crossing activities to verify clearance depths and to assure the integrity and support of the KMG faclity. All <br />installations of foreign crossings done by boring and or jacking require the KMG facility to be exposed to verify clearances. <br />• Foreign utilities shall not run parallel to KMG pipelines within the KMG easement without written permission by KMG. A <br />minimum of 10,0 feet of horizontal separation must be maintained in parallel installations whether the foreign utility is <br />placed within the KMG easement or adjacent to the KMG easement. Any deviation from the 10.0' horizontal requirement <br />must be approved in writing by KMG and an "as built survey° provided to KMG after Installation. <br />Page 1 of 4 Revision 3/01/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.