My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-09_PERMIT FILE - M2015030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015030
>
2015-12-09_PERMIT FILE - M2015030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:15 PM
Creation date
12/10/2015 8:16:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015030
IBM Index Class Name
PERMIT FILE
Doc Date
12/9/2015
Doc Name
Structure Agreements
From
Asphalt Specialties
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[111111 11111 IAIIIIIVI IIN NIIIIHIII III IIIIIII01111 <br />3591169 11/21/2008 02:18P Weld County, CO <br />5 of 22 R 111.00 0 0.00 Steve Moreno Clerk & Recorder <br />a. KMG shall install and maintain, at its sole cost and expense, all fences <br />around the Existing Wells and any Future Wells in compliance with the Rules and Regulations of <br />the COGCC; <br />b. KMG shall install and maintain, at its sole cost and expense, all gates and <br />locks reasonably necessary for the security of any Wells or Production Facilities in the Oil and <br />Gas Operations Areas. Such gates and locks shall be the standard gates and locks used by KMG; <br />c. KMG shall paint any production facilities for any Wells, including <br />wellhead guards, with paint that is approved by the COGCC; and <br />ASCI shall not inhibit KMG's access to the Oil and Gas Operations Areas or inhibit <br />KMG's operations within the Oil and Gas Operations Areas or in the vicinity of the Production <br />Facilities by landscaping or other improvements, unless otherwise agreed upon between ASCI <br />and KMG. ASCI shall place temporary concrete barriers around all Production Facilities as <br />directed by KMG before any nearby mining operations commence. In no event shall ASCI mine <br />within 90 feet of any Production Facilities or stockpile mined materials within a radius of 50 feet <br />of any Production Facilities. <br />6. NOTICE OF FUTURE OPERATIONS. <br />KMG shall provide at least seven (7) days prior written notice to ASCI of any operations <br />in connection with the reworking, fracturing, deepening or recompletion operation on an Existing <br />Well or Future Well; provided, however, that KMG shall provide at least thirty (30) days prior <br />written notice to ASCI of the initial drilling of any Future Wells. Regardless of the foregoing <br />notice requirements, KMG shall have immediate access to any of its facilities in the event of an <br />emergency. <br />After receipt of the above notice, but not less than five (5) working days prior to KMG's <br />mobilization on the applicable Oil and Gas Operations Areas, either KMG or ASCI may request <br />an on-site meeting. The purpose of the meeting shall be to inform ASCI of the expected activity <br />and to coordinate site access, hazards, barricades, restoration or any other issues that affect the <br />use and safety of ASCI's development. <br />7. COMPLIANCE WITH SAFETY REGULATIONS. <br />KMG understands that ASCI surface mining operations on the Property are subject to <br />certain MSHA regulations. KMG agrees that while conducting operations on the Property, it <br />will comply with such reasonable MSHA requirements which ASCI notifies KMG are applicable <br />to KMG's operations on the Property. KMG also agrees to inform its contractors and <br />subcontractors about such requirement. <br />5 <br />Surface Use Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.