Laserfiche WebLink
5. Will the extracted material be hauled offsite or used on the same parcel of property where the <br />material is extracted? Used on-site <br />6. How will the extracted material be used on site? Back -fill <br />If the material is hauled offsite. where will it be hauled to and what it the intended use? <br />S. What is the approximate areal extent of the proposed extraction in acres' <br />1/100th of acre <br />9. To what approximate depth will the exit action extend'' 6 feet <br />10. In cubic yards. approximately how much material will be removed'' 1.5 cubic yards <br />11. Will material extinction involve the use of explosives? No <br />12. Will site of extraction result in the exposure of tiiburaly ground mite' ' No <br />13. will either the landouiiei or the urine site opeiator receive any type of compensation. i e.. <br />monetary. in-kind. haulage fees. etc . from the proposed material extraction? No <br />14. Please supply a copy of any documents that will ensure that the area of extraction will be <br />ieclanned to some beneficial land use once exnaction activities have been completed. <br />USFS Plan of Operations attached <br />15. Do you have permits for this activity from any otter _ovenuneutal agencies such as building. <br />Construction. or grading peniuts. and if so. what are they' USFS Plan of Operations (attached to prior email) <br />16. Are there state federal local agency participants in terms of funding <br />«'liar are the percentages'' <br />-(no). design I I - <br />(nor <br />1'. <br />What poet )iiiiii ' Uses will be tirade of the site of extlactron and why'' Public recreational use of <br />(This question helps us determine the intent of the activity) USFS ORV area <br />1S. What types amid sues of equipment will be used m the exti actioir' Small hand tools <br />