Laserfiche WebLink
Exhibit E — Reclamation Plan <br /> plant(s), concrete batch plant, asphalt batch plants, recycling facilities and related <br /> operations, shop, scale-house/office, and supporting facilities (fuel depots, parking <br /> areas, oil and gas facilities access, etc.) for continued industrial - commercial use (as <br /> validated by any co-related and required Weld County Building Permits); the creation of <br /> unforeseen future structures, and for the use and development of on-site water <br /> resources. Since the area of surrounding lands is a mix of these uses, the site end use <br /> will retain these potentials. <br /> The rate of reclamation activity, including grading, soiling and revegetation will follow <br /> concurrently with extraction and the respective timetables identified for extraction <br /> under Exhibit D — Extraction Plan. All timetables are contingent upon market <br /> conditions, therefore, a probable range of time is indicated. With extraction activities <br /> anticipated to take up to 20 years to complete, reclamation will add an approximately <br /> five years to this estimate, bringing the anticipated life of the mine to 25± years, or the <br /> year 2035. <br /> A Backfill Notice follows this page, as part of this Exhibit. The use of inert fill will <br /> facilitate the timely fill of selected portions of the project area as desired, and related <br /> reclamation of affected lands and use of related water resources (refer to Exhibit L — <br /> Reclamation Costs). <br /> Varra Companies, Inc. Permit M-2010-049 4 <br /> Western Sugar Reclamation Land Development Project OMLR 112 Permit Amendment 2015 <br />