My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-07_REVISION - M2010049
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010049
>
2015-11-07_REVISION - M2010049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:17 PM
Creation date
12/9/2015 7:46:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010049
IBM Index Class Name
REVISION
Doc Date
11/7/2015
Doc Name
Application AM01
From
Varra Companies, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D- Extraction Plan <br /> 6.4.4 EXHIBIT D - Mining Plan <br /> The mining plan shall supply the following information, correlated with the affected <br /> lands, map(s) and timetables: <br /> (a) description of the method(s) of mining to be employed in each stage of the <br /> operation as related to any surface disturbance on affected lands; <br /> (b) earthmoving; <br /> (c) all water diversions and impoundments; and <br /> (d) the size of area(s) to be worked at any one time. <br /> (e) An approximate timetable to describe the mining operation. The timetable is for <br /> the purpose of establishing the relationship between mining and reclamation <br /> during the different phases of a mining operation. An Operator/Applicant shall <br /> not be required to meet specific dates for initiation, or completion of mining in a <br /> phase as may be identified in the timetable. This does not exempt an <br /> Operator/Applicant from complying with the performance standards of Section <br /> 3.1. If the operation is intended to be an intermittent operation as defined in <br /> Section 34-32.5-103(11)(b), C.R.S., the Applicant should include in this exhibit a <br /> statement that conforms to the provisions of Section 34-32.5-103(11)(b), C.R.S. <br /> Such timetable should include: <br /> (i) an estimate of the periods of time which will be required for the various <br /> stages or phases of the operation; <br /> (ii) a description of the size and location of each area to be worked during <br /> each phase; and <br /> (iii) outlining the sequence in which each stage or phase of the operation will <br /> be carried out. (Timetables need not be separate and distinct from the <br /> mining plan, but may be incorporated therein.) <br /> (f) A map (in Exhibit C - Pre-Mining and Mining Plan Maps(s) of Affected Lands, <br /> Subsection 6.4.3) may be used along with a narrative to present the following <br /> information: <br /> (I) nature, depth and thickness of the deposit to be mined and the thickness <br /> and type of overburden to be removed (may be marked <br /> "CONFIDENTIAL," pursuant to Paragraph 1.3(3)); and <br /> (ii) nature of the stratum immediately beneath the material to be mined in <br /> sedimentary deposits. <br /> (g) Identify the primary and secondary commodities to be mined/extracted and <br /> describe the intended use; and <br /> (h) name and describe the intended use of all expected incidental products to be <br /> mined/extracted by the proposed operation. <br /> (i) Specify if explosives will be used in conjunction with the mining (or reclamation). <br /> In consultation with the Office, the Applicant must demonstrate pursuant to <br /> Subsection 6.5(4), Geotechnical Stability Exhibit, that offsite areas will not be <br /> adversely affected by blasting. <br /> Varra Companies, Inc. Permit M-2010-049 1 <br /> Western Sugar Reclamation Land Development Project OMLR 112 Permit Amendment 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.