My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-02_INSPECTION - M1984039
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1984039
>
2015-12-02_INSPECTION - M1984039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 11:54:50 PM
Creation date
12/8/2015 10:37:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984039
IBM Index Class Name
Inspection
Doc Date
12/2/2015
Doc Name
Operator's Comments After Inspection and SI
From
Wilbur Benham
To
DRMS
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ex�,ibit iS ^"ininp: Plan. <br /> 7inint on the mineralized rock outcrop on the North East corner <br /> of the claim would begin as soon as Permitted and road conditions <br /> would allow. <br /> The area to be mined is a previously mined zone with access by <br /> established roads . The face of the ore body is exposed 20 feet <br /> in height, and 40 feet in width. Mining would be done by cutting <br /> a bench back from the edge which is almost vertical at present, <br /> until a suitable working area is cut from the face . <br /> Surface mininr- of the ore body face would continue for approximately <br /> 50 feet until the ore body dips under the Quartz rock cap, afte ,which <br /> normal. normal underground mininK methods would begin, <br /> Due to the very limited working season and lack of access to the <br /> area during winter, progress is expected to be slow, with projected <br /> mine life of 20 ( twenty) ,years . I would like to begin operation <br /> on or about June 1, 1984. <br /> ilinin�T is to be done by contract operators, for each stage of the <br /> project. employment will be limited to 2 (two) employees if <br /> required, plus myself. <br /> Ore would be hauled via Picayune gulch road to Animas Forks road <br /> for processin7 by a custom mill at another location. <br /> Storage of ore is not practical due to the location of the mine <br /> site and the mining plan method , which requires the removal of <br /> ore as it is mined in order to progress . <br /> . A Temporary buiidir:_�- -mill be placed below the mining operations <br /> on the '.n,, mas Forks road to be used as a repair and storage facility <br /> and shipping area for ore . <br /> This site is on a Patented .Iaim #14916 "Fortune" Which is owned <br /> by me , and is an associated claim to the Toltec group. <br /> /V c),Vej- Fr o rvi P), <br />
The URL can be used to link to this page
Your browser does not support the video tag.